BES-Technical provided Stage 2, 3 and 4 high-voltage design services for a new 11kV/400V substation supporting the development of a new facility within a secure defence estate. The project formed part of a £15m MEP programme and required detailed analysis of the existing electrical infrastructure. 

Scope of work

BES-Technical was responsible for: 

  • HV fault calculations to BS EN 60909 
  • BS EN 50522 earthing study for the new substation 
  • IEEE Std 1584-2018 Arc Flash Analysis 
  • Load analysis 
  • Switch room overheating assessment 
  • Associated drawings, schedules, schematics and calculations 

The challenge

The project required the integration of new electrical infrastructure within an existing site-wide network. Understanding the capability and limitations of the existing infrastructure was critical to ensuring the proposed development could be supported safely and effectively.

 

The outcome

Through detailed analysis of the existing electrical network, BES-Technical identified significant constraints within the site’s infrastructure that could impact future development. 

 

The team provided technical recommendations and supporting evidence to help the end client understand the issues and develop a business case for future infrastructure investment, supporting the long-term development strategy for the site. 

What our clients say about us

“BES-Technical have been a trusted design partner to TClarke on MOD projects, demonstrating strong technical capability and a proactive, solution-focused approach. Their support has contributed significantly to the successful delivery of complex projects.”

Treve Murley

Project Manager, T-Clarke

“MSB Group have worked with BES-Technical on several projects now, and they have been extremely knowledgeable, highly responsive, and very professional throughout. They always go the extra mile, and we are really looking forward to working with them on many future projects in the years ahead.”

Matty Beecher

Managing Director, MSB Group

What our clients say about us

Ready to talk to us about your project?

Send us a brief outline of your project and we’ll get back to you within 24 hours.

Scroll to Top